Why preparation pays off
EMC testing is paid by the hour. A well-prepared sample is measured quickly and the result is meaningful. An unprepared sample means extra hours, or even a new appointment.
Our testing is pre-compliance. It shows whether the product will pass and, if not, why. You then have time to fix it before you pay for a certification test or start production.
Operating modes and performance criteria
The product is measured in the mode in which it “interferes” the most, and at the same time we need to know how to tell that it has withstood interference. Only you can answer these two questions.
Worst case for emissions
Turn everything on at once: all interfaces communicating, the display on, the motor running, the processor at full clock. Best of all is test firmware that cycles through the functions by itself. Then nobody has to go into the chamber to switch modes.
Performance criteria for immunity
Immunity standards distinguish what may happen during the disturbance:
- A: the product works normally throughout.
- B: performance may degrade temporarily but recovers by itself once the disturbance stops.
- C: the function may be interrupted and is restored by the operator, e.g. by a restart.
The standard determines which criterion applies to which test. But what “works normally” means for your particular product is something you must describe. For example, “data is transferred without errors” or “the value on the display does not change by more than 1%”.
Cables and accessories
For most products, the cables radiate more than the electronics itself. So bring the cables your customer will use, in the same length and type. A shielded cable instead of an unshielded one, or vice versa, changes the result completely.
Do not forget the power supply you will ship with the product and everything the product needs for normal operation: sensors, loads, the other end of the communication.
Documents to send us in advance
A few lines of text are enough. They let us prepare the test before you arrive, so no time is lost in the chamber.
- Where the product is used. Residential and office, or industrial? This determines the limits, e.g. class B (stricter) or class A.
- Ports and cables. Each port is tested separately, so their number affects the duration and price of testing.
- Highest frequency in the product. It determines up to which frequency radiated emissions are measured.
- Standards, if you know them. If not, you can find them with the EMC and CE calculator.
Checklist: ready for testing
What a test day at our lab looks like
- Arrival and setup. Together we place the sample on the table or turntable, connect the cables and check that it runs.
- Emissions. We measure what the product radiates and what it sends into cables. You see the results on screen right away, with the limit line.
- Immunity. We expose the product to disturbance and watch whether it works according to the criteria we agreed on.
- If something fails, we look for the cause on site and propose a fix. Our engineers can work it straight into the schematic or the board.
- The test report with results and recommendations is delivered after testing.
The complete CE guide as a PDF
All 11 guides in one document: directives, EMC and safety testing, technical documentation, manual and rating label. For printing and for your team.
Estimate the cost of testing
Enter what the product does and which interfaces it has. The calculator identifies the standards, tests and an indicative price. We can usually offer testing within a week.